FAQ
You are here: Home » Service » FAQ

FAQ

  • Q 1. System Composition

    A
    (1)EMS Coil
    (2)Electric system  
      · Main power transformer             
      · Grounding resistance box             
      · Power distribution and system industrial control cabinet  
      · Power distribution cabinet           
      · Variable frequency power supply cabinet   
      · Local operation cabinet for water system       
      · Relay terminal box                    
    (3)Remote monitoring operation system     
      · Remote IPC software                  
    (4)Cooling water system  
      · Cooling water device                    
      · Pure water machine   
  • Q 2. How about the metallurgical performance?

    A
    EMS type & combination M-EMS M+F-EMS M+S+F-EMS M+S-EMS S-EMS S+F-EMS
    Pinhole & blowhole *** *** *** ***
    Surface & subsurface cracks *** *** *** ***
    Break-out reduction *** *** *** *** *+ *+
    Solidification structure & internal crack ** ** *** *** ** **
    Centerline segregation, center porosity ** *** *** ** ** **
    V segregation *** ** * *+ **

  • Q 3. Quality assurance

    A 12 months from the commissioning date or 18 months after the goods arrive at the designation, whichever first.
  • Q 4. Terms of payment

    A T/T, L/C.
 
Zhongke Electric is committed to R&D and providing complete solution for electromagnetic metallurgy, as well as on-line heating system for continuous rolling.

Navigation

Product Category

Contact Us

  Contact Person: Eric Wang
  Tel: +86-730-8688890
  Phone: +86-15173020676
  E-mail: wangfp@cseco.cn
 Copyrights 2021 Hunan Zhongke Electric Co., Ltd. All rights reserved. Supported by Leadong.